FAQs
Business Owners
What can a battery energy storage system do for my business?
A commercial battery energy storage system (BESS) can reduce electricity costs through peak shaving and time-of-use arbitrage, improve solar self-consumption, manage demand charges, and provide backup power during grid outages. WHES systems combine battery storage with intelligent EMS control to optimize energy use based on site conditions and electricity tariffs.
How do I size a commercial battery energy storage system?
BESS sizing depends on your peak demand, daily energy consumption, electricity tariffs, solar generation, backup requirements, and target operating hours. Power (kW) determines how much load the system can support, while energy capacity (kWh) determines how long it can operate. WHES offers scalable C&I energy storage solutions for different site sizes and applications.
All-in-one BESS or modular energy storage system: which should I choose?
An all-in-one BESS integrates batteries, PCS and control systems into a compact solution, making installation faster and simpler. Modular systems provide greater flexibility for larger or customized projects. The right choice depends on site space, capacity requirements, existing equipment and future expansion plans.
Can a commercial battery storage system participate in a VPP?
Yes. A battery energy storage system can participate in a Virtual Power Plant (VPP) when local market, metering and grid requirements allow. WHES OS supports integration with third-party VPP and energy platforms through standard interfaces including OpenAPI and Modbus.
What certifications and grid standards do WHES energy storage systems support?
WHES energy storage products are designed for multiple international markets and comply with applicable grid connection, safety and cybersecurity requirements. Certifications and standards vary by product and region, including requirements for Europe, Australia and other global markets. Please check the relevant product or certification page for specific details.
Homeowners
How to share devices on ECOS?
Enter the bottom function bar - "Me" - "Device management" - "Device details" - "Device QR code", and share it to other ECOS accounts which are registered in the same area.
All-in-one home battery or hybrid inverter + battery: which should I choose?
An all-in-one home energy storage system offers simpler installation and a compact footprint, while a hybrid inverter with separate battery modules provides greater flexibility for capacity expansion. WHES offers both configurations to suit different residential energy needs.
What operating modes are available for a home battery storage system?
WHES residential energy storage systems support self-consumption, backup power, scheduled charging and discharging, and intelligent energy optimization. WHES AI+ can automatically optimize battery operation based on electricity prices and household energy demand.
What battery capacity do I need for home backup power?
Start by calculating the total power consumption of essential loads such as refrigerators, lighting, routers and other critical appliances. Multiply their energy consumption by the desired backup duration to estimate the required battery capacity in kWh.
Can I add an EV charger to my home energy storage system later?
Yes. An EV charger can be integrated with a compatible WHES home energy system after installation. Through ECOS, solar generation, battery storage, household loads and EV charging can be managed within the same energy ecosystem.
Will my home battery still work if the internet goes down?
Yes. Essential local functions such as battery charging, discharging and backup operation can continue without an internet connection. Remote monitoring and app-based controls may be temporarily unavailable until connectivity is restored.
Installers & Distributors
How to reconfigure the WIFI of BESS?
The master account (the ECOS account who do the WIFI configuration for the BESS) needs to remove the device from the account and reconfigure the WIFI again according to the WIFI configuration steps.
How many photovoltaic panels can the inverter connect?
1. Such as the maximum PV input power of the 6kW inverter is 8000W, there are two MPPT, each MPPT maximum input power is 4000W, and each string open circuit voltage is 600V, it is recommended to install panels according to the upper limit of MPPT voltage.
2. The calculation is based on the open circuit voltage and power of the solar panels, which is strictly required not to exceed 600V, and the excess power will be wasted.
3. If the working current of the solar panel exceeds the maximum input current of the inverter, the solar panel can also be used, but the system can only generate power according to the maximum input current.
2. The calculation is based on the open circuit voltage and power of the solar panels, which is strictly required not to exceed 600V, and the excess power will be wasted.
3. If the working current of the solar panel exceeds the maximum input current of the inverter, the solar panel can also be used, but the system can only generate power according to the maximum input current.
How can installers manage multiple energy storage systems remotely?
Installers can use ECOS Hub to centrally monitor and manage multiple WHES energy storage systems. Functions include batch configuration, remote monitoring, diagnostics and O&M management, helping reduce unnecessary on-site visits.
Can WHES platforms manage third-party energy equipment?
Yes. WHES systems support integration with compatible third-party equipment through standard communication protocols such as Modbus RTU. Using WHES equipment provides access to the full ECOS and ECOS Hub feature set.
Can ECOS Hub integrate with VPP or third-party EMS platforms?
Yes. ECOS Hub provides OpenAPI interfaces for integration with VPP, EMS and other third-party energy platforms. This allows distributed energy assets to be connected to external aggregation and energy management systems where market requirements permit.
Can WHES energy storage systems be commissioned without internet access?
Yes. Compatible WHES systems support local commissioning and configuration without an active internet connection, including Bluetooth-based configuration for supported devices.
Can distributors manage different installers or sub-dealers separately?
Yes. ECOS Hub supports multi-level account and permission management, allowing distributors and sub-dealers to access and manage only their authorized devices and projects.
Utility & Energy Service Providers
What does the feed-in percentage mean?
1. This percentage calculation is based on the inverter power parameters. For example, for a 6kW machine, setting 100% feed-in means that the system can export power to grid with a maximum power of 6kW.
2. If 50% is set, the system will export power to the grid with a maximum power of 6kW × 50% = 3kW.
3. If there is no need to export power to grid, just set it to 0%.
2. If 50% is set, the system will export power to the grid with a maximum power of 6kW × 50% = 3kW.
3. If there is no need to export power to grid, just set it to 0%.
Utility-scale battery storage or VPP aggregation: which should I choose?
Utility-scale battery storage is typically suited to large centralized projects requiring applications such as frequency regulation, peak shifting or AGC/AVC dispatch. VPP aggregation is designed to coordinate multiple distributed energy assets. Energy service providers may also combine both approaches depending on their asset portfolio and market strategy.
2-hour vs. 4-hour battery storage: what is the difference?
A 2-hour BESS is generally suited to power-focused applications such as frequency regulation and other short-duration grid services. A 4-hour BESS provides greater energy capacity for applications such as peak shifting, energy arbitrage and capacity support. The optimal duration depends on the target revenue streams and local market requirements.
What should I check before using a BESS for FCAS or FFR?
Check the system's response speed, power control capability, EMS functionality and compliance with the target ancillary services market. WHES OS supports applications including Australia's FCAS and Europe's FFR, while AGC/AVC capabilities are available for applicable grid-service scenarios.
What should I check for BESS grid interconnection and cybersecurity?
Grid connection requirements vary by country, grid operator and project type. Project developers should verify applicable grid codes, communication protocols, cybersecurity requirements and previous interconnection experience early in project development.
Should I build a VPP platform or integrate through an existing API?
Building a proprietary VPP platform provides greater control over aggregation and market strategies but requires more development resources. Using an existing OpenAPI can shorten integration time and simplify connection between distributed energy assets, VPP platforms and energy management systems.
General (All Users)
How to simply understand the three operating modes, self-powered, time-based control and backup mode?
1. Self-powered: The system firstly uses solar power and supply to the home loads, the excess solar power to charge the battery, if there still has excess solar power, it will be output to the grid according to the settings of feed-in percentage. If the solar power is not enough to power the load, battery will discharge to loads, if the battery power is still not enough, this time the power will be taken from the grid. The use of the grid will only happen when there are not enough solar power and battery power.
2. Time-based control: According to the requirements, you can set the battery charging and discharging time periods, such as charging the battery when the electricity price is low, and selling electricity when the price is high. The system supports four charging and discharging periods. During the discharge period, the battery can generate full power exporting to grid.
3. Backup: The critical loads need to be connected to the EPS port. Under normal circumstances, the battery will retain more than 80% SOC. After the power grid is cut off, the system will continuously supply power to the EPS critical loads.
2. Time-based control: According to the requirements, you can set the battery charging and discharging time periods, such as charging the battery when the electricity price is low, and selling electricity when the price is high. The system supports four charging and discharging periods. During the discharge period, the battery can generate full power exporting to grid.
3. Backup: The critical loads need to be connected to the EPS port. Under normal circumstances, the battery will retain more than 80% SOC. After the power grid is cut off, the system will continuously supply power to the EPS critical loads.
How to change the device operating mode?
Enter the ECOS homepage, touch the "Mode" function on the bottom function bar, enter the device mode setting interface, select different modes, set specific parameters and save.
Does the device support off-grid solution?
1. It can support off-grid solution, but it requires a network connection. The device must be connected to the network, done the WIFI configuration and be online. If you cannot keep it online for a long time, the warranty may be affected.
2. Off-grid solution, the load needs to be connected to the EPS port, so the high-power inductive load or capacitive load may not operate or affect the normal operation of the BESS.
2. Off-grid solution, the load needs to be connected to the EPS port, so the high-power inductive load or capacitive load may not operate or affect the normal operation of the BESS.
Can WHES energy storage systems operate without a cloud connection?
Yes. WHES supports both cloud-based and private deployment options. For projects with strict data-security or network requirements, selected systems can support private or offline deployment so that operational data remains within the customer's own environment.
What is the difference between WHES OS and ECOS?
WHES OS is designed primarily for commercial, industrial and utility-scale energy assets, while ECOS focuses on residential and distributed energy systems. ECOS Hub provides centralized management for larger fleets of distributed residential assets.
Are WHES energy storage systems adapted to different countries and grid standards?
Yes. WHES products are designed for international deployment, with hardware, software and grid-control functions adapted to different regional requirements. Product certifications and grid compatibility vary by model and market.
Can WHES energy storage systems be monitored and serviced remotely?
Yes. WHES platforms support remote monitoring, configuration, diagnostics and firmware/OTA updates. Many operational issues can therefore be addressed remotely, while hardware-related problems can be handled through WHES's global service network.
How experienced is WHES in the global energy storage market?
WHES provides residential, commercial & industrial, utility-scale and energy management solutions across global markets. Its portfolio covers battery energy storage systems, intelligent EMS, VPP integration and related energy management applications.